Skip to content

Specifications

Overall dimensionsTBD
Tier count3
Can diameter rangeTBD
Capacity per tierTBD
StackableYes — with a second unit
Static load per tierTBD

Capacity per tier is a function of can diameter and channel spacing, not of the rack's outer dimensions. Two racks with identical footprints can hold different quantities, so capacity must be quoted against a stated can size.

A gravity-feed can organizer: cans rest on sloped channels and roll to the front as the nearest one is removed.

Why capacity must be quoted against a can size

The number of cans a tier holds depends on the can diameter and the channel pitch — not on the rack’s footprint. Two racks of identical outer dimensions can differ substantially in capacity. Any capacity figure we publish is therefore stated together with the can diameter it assumes.

⚠️ 本产品页为框架占位:型号与全部规格均为 TBD。

Compliance for your market

Documents are filtered by destination market.

  • ISO 9001

    Quality management system

    Management system

    Accredited certification body

Required for: North America

Common questions about this product

See all questions
Which materials and finishes can you produce?

Wire and tube

  • Carbon steel wire — the default for retail kitchen and home organization products
  • Stainless steel wire and flat rail — for corrosion resistance without a coating

Sheet metal

  • Stainless steel stampings — drain boards, rails, brackets

Plastic parts

  • PP trays, castors and inserts (sourced to your specification)

Finishes

Finish Typical use Constraint
Powder coated Any RAL tone, matte or gloss Must pass the food-contact route of the destination market
Chrome plated Premium retail appearance Scratches expose the substrate
Electropolished Stainless parts needing corrosion resistance without coating Stainless substrates only

The finish is a compliance decision before it is a cosmetic one — see Which certifications can you provide for our market?

How do I know which wire diameter I need?

Wire diameter is derived, not chosen. It follows from the load case:

Expected load per tier
  → span between supports
  → number and spacing of cross wires
  → required wire diameter
  → weld pattern

Two racks with identical outer dimensions can use different wire gauges and behave completely differently under a full dishwasher load or after a year of use.

So the useful input from you is the load case (what sits on it, how much, and whether it goes in a dishwasher), not a target diameter. We will come back with the gauge and the weld pattern that satisfy it.

⚠️ 占位内容:具体线径范围待工程确认后填入。

What is your minimum order quantity?

MOQ is not a fixed number — it is a consequence of three things:

  1. Tooling — a new wire-forming jig only pays for itself above a certain volume
  2. Finishing batch — powder coating and plating run in batches, so very small orders get expensive per unit
  3. Material order — wire is bought by the tonne, and a small order may leave unusable offcuts

Because of that, we quote MOQ together with tooling cost and unit price, so you can see the trade-off instead of receiving a single arbitrary number.

⚠️ 占位内容:具体 MOQ 数值待业务方按产线实际情况提供,本文刻意不填。

Which certifications can you provide for our market?

Certification is market-specific, so the answer depends on where you are selling:

Market Food-contact route Also typically requested
North America FDA 21 CFR California Proposition 65, NSF
European Union EU 1935/2004 REACH, RoHS
Germany EU 1935/2004 plus LFGB REACH, RoHS

On top of the market-specific items we hold ISO 9001 and can arrange BSCI / amfori social compliance audits and SGS material test reports.

Two practical points worth flagging:

  1. Test reports are issued against a specific material and finish. Change the coating supplier and the report may no longer apply.
  2. Reports are per order, not off the shelf. Documents that are public are listed on the certifications page; others we issue on request with the quotation.

⚠️ 占位内容:具体证书编号与有效期待业务方提供。

Can you supply knock-down to reduce freight cost?

Yes, and on bulky wire products it is usually the largest controllable cost in the whole programme.

A welded wire frame is mostly air. Shipping that air across an ocean is pure waste. A KD (knock-down) structure ships flat, which cuts container volume substantially — so when you compare suppliers, compare cubic metres per unit, not just unit price.

Two things to weigh before choosing KD:

  • Assembly effort moves to your customer. For retail this has to be either tool-free and obvious, or a stated feature (“assembles in under a minute”).
  • Rigidity perception. A KD frame must still feel solid once assembled. That is a joint and locking-tab design problem, and it is where the engineering effort goes.

Send us your drawing or sample

Tell us the application, target market and annual volume. Our engineering team will review feasibility, tooling and lead time.